Nutanix
654 Case Studies
A Nutanix Case Study
Boulder Dam Credit Union needed to replace a difficult-to-manage VMware environment that required after-hours maintenance, had limited rollback options, and often suffered from slow support and poor documentation. The team wanted a more visible, reliable infrastructure and evaluated Nutanix hyperconverged infrastructure as a strong alternative.
Nutanix implemented a single-cluster deployment using Nutanix Move for migration, along with Nutanix AHV, Nutanix Frame, Nutanix Files, and Nutanix Prism. The migration finished in 1.5 days instead of the 3 days planned, support resolved one issue in 30 minutes, and BDCU now runs 25 VMs and 25 VDIs with simpler management, lower licensing costs, faster file access, and less downtime.
Adam Dailey
IT Manager