Case Study: DTK Group achieves 90% faster order processing with nShift Ship

A nShift Case Study

Preview of the DTK Group Case Study

DTK Group cuts order processing time by 90% with nShift

DTK Group, a company specializing in warehousing and logistics, faced a challenge in its order fulfillment process. Their old method required manually printing separate documents for each order, a slow and labor-intensive workflow that took over two minutes per order. With rapid growth, DTK needed a more efficient solution, which they found by implementing the nShift Ship solution.

Working with nShift, DTK integrated a new system that combined the packing slip and shipping label onto a single, printed label. This solution slashed the processing time from two and a half minutes to just 15 seconds per order. The results for DTK were significant, including a 90% faster processing speed, a daily saving of 35 printing hours, and a reduction in errors and plastic waste.


View this case study…

nShift

150 Case Studies