Northwest Analytics
20 Case Studies
A Northwest Analytics Case Study
Unimix, the largest ready‑mix concrete producer in Dubai and the primary supplier to major tower projects including the Burj Dubai, faced the challenge of supplying consistent, high‑strength concrete at massive scale while demonstrating process capability to meet ISO 9001 standards. To manage a 24/7 virtual pipeline of over 160 trucks, complex raw material inputs, and rigorous specifications for the world’s tallest building, Unimix adopted Northwest Analytics’ NWA Quality Analyst.
Northwest Analytics’ NWA Quality Analyst delivered statistical process control, control charts (CUSUM/Shewhart) and process capability reporting that replaced manual Excel methods, enabling Unimix’s laboratory to monitor 28‑day strength, rheology and incoming material properties, quickly diagnose out‑of‑control conditions and make corrective adjustments. The solution streamlined reporting, improved quality visibility and helped Unimix consistently meet specifications—supporting its role on the Burj Dubai project, sustaining large‑scale continuous delivery and maintaining ISO 9001 certification.
Issam Omar Abbas
Technical Manager