Nintex
302 Case Studies
A Nintex Case Study
MAN Energy Solutions, an advanced‑manufacturing arm of MAN SE with 15,000+ employees across 100+ sites in Denmark and Germany, faced frequent workflow outages from a complex, hardware‑intensive SharePoint solution that had a single point of failure and required costly, remote UK‑based interventions. The instability and intimidating workflow design hurt productivity and adoption across the business.
Working with Innofactor, MAN moved to Nintex Workflow, simplifying and automating approval processes, empowering business users to build workflows, and implementing multi‑point failover for much greater reliability. The result: licensing and operational costs fell (~15%), business productivity rose 55%, customer service improved 30%, and downtime was reduced to “nearly nothing.”
Fernando dos Santos Nunes
System Consultant