Case Study: Al Abbar Group achieves 30% faster patch deployments and 20% less endpoint downtime with NinjaOne

A NinjaOne Case Study

Preview of the Al Abbar Group Case Study

NinjaOne Transforms Al Abbar Group’s IT Management

Al Abbar Group, a 50‑year‑old leader in façade solutions operating across the Middle East, Asia, North America and Europe, needed to centrally manage a distributed IT estate (reported at 650+ endpoints) and address slow, error‑prone patching, complex approval cycles, third‑party limitations and bandwidth challenges. To modernize endpoint and patch management the Group evaluated several platforms and selected NinjaOne (NinjaOne Professional, using Endpoint Management and Patch Management) to replace its legacy tooling.

NinjaOne was deployed as the primary remote IT and patch management platform, bringing unified device visibility, asset details, activity logging, and scripting/automation (PowerShell and batch) for scheduled and ad‑hoc tasks. The result: a 30% reduction in patch deployment time, a 25% drop in manual technician intervention, a 20% reduction in endpoint downtime, and a reported 15% cost advantage versus alternatives — demonstrating tangible efficiency and security gains from NinjaOne.


Open case study document...

Al Abbar Group

Manoj Gopalakrishnan

Director of Information Technology


NinjaOne

83 Case Studies