Newforma
64 Case Studies
A Newforma Case Study
WSP, the engineering firm working on the complex Boston Landing development in Brighton, Massachusetts, faced major construction-efficiency challenges, including slow uploads and downloads of large BIM files, delayed punch list distribution, and communication bottlenecks between the field and office. These issues were especially difficult on a congested site near the Massachusetts Turnpike, where manual workflows and travel time slowed project progress.
Newforma’s Project Information Management solution, including its mobile applications, helped WSP capture and share field information directly from an iPad with marked-up plans, notes, and photos. By connecting field and office teams more quickly, Newforma reduced delays in construction and project closeout, improved collaboration, and helped streamline responses to keep the project moving.