Case Study: BDP achieves greater project efficiency and risk management with Newforma Project Center

A Newforma Case Study

BDP achieves 4X ROI and saves 20 minutes a day with Newforma

BDP, a major international architecture, engineering, and design firm, was challenged by the lack of integrated information management software for its large, multi-national projects. Their previous system was cumbersome, did not integrate with email or BIM processes, and hindered access to knowledge across projects. This led them to seek a solution from vendor Newforma.

By implementing Newforma Project Center, BDP achieved significant results including an annual ROI of 4x, with the software paying for itself within 12 weeks of use each year solely from time savings. Newforma provided improved risk management by making project information instantly accessible and eliminated £20,000 in annual FTP site costs. The solution was also adopted much more easily than their previous system.