Case Study: Adix achieves more accurate deliveries and lower transport costs with NETRONIC VAPS

A NETRONIC Case Study

Preview of the Adix Case Study

How Adix achieved accurate delivery times, savings in transportation costs, as well as happier customers and employees

Adix, a Spanish manufacturer of industrial explosion protection systems, faced significant challenges in its production planning. Their manual, Excel-based methods, and even their subsequent ERP system, Microsoft Dynamics 365 Business Central, failed to provide control over purchases and production, leading to inaccurate delivery dates, frustrated customers, and high air freight costs. Seeking a solution, their ERP partner recommended the vendor NETRONIC and its Visual Advanced Production Scheduler (VAPS).

By implementing NETRONIC's VAPS, which integrated with their Dynamics system, Adix gained crucial transparency and control over their scheduling. The results were a dramatic 80-90% improvement in on-time deliveries, significantly higher customer satisfaction, and major savings from switching from expensive air freight to container shipping. Additionally, NETRONIC's solution provided a more stable schedule, leading to reduced stress and increased satisfaction among employees.


View this case study…

Adix

Ignacio Garrido Ceca

Managing Director


NETRONIC

19 Case Studies