Case Study: Endform scales Playwright end-to-end testing with Neon

A Neon Case Study

Preview of the Endform Case Study

Endform provisions PR environments in seconds with Neon

Endform, a platform for running Playwright end-to-end tests, needed a scalable and isolated database solution for their infrastructure to help engineering teams achieve high-velocity deployments. Their challenge was to avoid vendor lock-in and maintain control over their tech stack, including their authentication model, after initially building on Supabase.

The vendor, Neon, provided a serverless Postgres solution that enabled Endform to create dynamic, ephemeral database branches for every pull request. This integration, managed with Alchemy, allowed for faster, more reliable testing by ensuring each test environment had a populated, production-like database. As a result, Neon's solution gave Endform the performance and scalability they required while preventing potential bugs from reaching production.


View this case study…

Neon

39 Case Studies