Case Study: Leading UK Manufacturing Group achieves automated energy monitoring and improved efficiency with MRI eSight

A MRI eSight Case Study

Preview of the Leading UK Manufacturing Group Case Study

Monitor Energy Efficiency Within Manufacturing Sites

Leading UK Manufacturing Group, which operates multiple production companies across the UK, needed a way to monitor energy efficiency and analyse production data for performance insights. They required automated data collection, import of complex historical energy records, anomaly alarms for energy profiles, and the ability to compare tariff data against consumption — and engaged MRI eSight to address these challenges using the eSight® energy management platform.

MRI eSight implemented eSight® across the corporate network to automate data capture, import historical datasets, configure alarms for unusual energy signatures, and enable tariff vs consumption analysis accessible from any PC. The solution saved time by eliminating manual data collection, improved visibility and faster anomaly detection, and gave the Leading UK Manufacturing Group a centralized tool to better manage and optimise energy use.


Open case study document...

Leading UK Manufacturing Group

PF

Technical Director


MRI eSight

17 Case Studies