mJobTime
16 Case Studies
A mJobTime Case Study
Gaylor Electric, a decentralized electrical contracting company with over 600 field employees across 38 states, faced a significant challenge in collecting timely and accurate data from its workforce. Their legacy manual system created a massive data-entry burden and a weekly payroll "fire drill." This prompted them to seek a specialized solution from the vendor mJobTime.
mJobTime implemented a solution utilizing rugged mobile devices to standardize field data collection. Key features included barcode scanning for employee verification, daily time reporting, and heavy equipment tracking. This integration provided instant visibility into labor costs. As a result, Gaylor saves an estimated 200 hours per month in processing time and reduced its annual labor costs by 1%, equating to roughly $10,000 in monthly savings. The mJobTime solution also provided an early warning system for project managers and improved job cost accuracy.