Case Study: Xi’an Xianyang International Airport cuts HVAC costs and improves energy management with Mitsubishi Electric Iconics Digital Solutions’ GENESIS64

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the Xi’an Xianyang International Airport Case Study

Xi’an Xianyang International Airport manages 360,000 sq. meters with Mitsubishi Electric Iconics Digital Solutions

Xi'an Xianyang International Airport, a major transportation hub in China, required a scalable energy management system to safely and cost-effectively monitor its vast and expanding facilities. The airport partnered with Mitsubishi Electric Iconics Digital Solutions to implement its GENESIS64 HMI/SCADA suite, including its energy and facility analysis tools, to address these challenges.

The solution provided by Mitsubishi Electric Iconics Digital Solutions included advanced 3D visualization and geo SCADA mapping to monitor distributed assets, alongside analytical tools for fault and energy analysis. This resulted in streamlined energy center management, improved heat production efficiency, and significant cost savings on HVAC and other energy expenses for the airport.


View this case study…

Mitsubishi Electric Iconics Digital Solutions

167 Case Studies