Case Study: ScholleIPN achieves rapid global rollout of mobile-responsive OEE, SPC and downtime dashboards with Mitsubishi Electric Iconics Digital Solutions

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the ScholleIPN Case Study

ScholleIPN - Customer Case Study

ScholleIPN, based in Gateshead, UK, faced fragmented production data, hundreds of “data islands,” manual paper-based shift reporting and inconsistent OEE calculations across its global sites, plus a mix of legacy SCADA systems that hindered scalable improvements. To address this, ScholleIPN selected Mitsubishi Electric Iconics Digital Solutions’ ICONICS software suite (including GENESIS64, MobileHMI and the Bulk Asset Configurator/AssetWorX) to standardize dashboards, HMIs and data collection across its operations.

Mitsubishi Electric Iconics Digital Solutions implemented a PoC and then rolled the solution across ScholleIPN’s sites, delivering mobile‑responsive OEE, SPC, scrap and downtime dashboards, language‑aliased HMIs and native Azure Power BI integration. The deployment now covers 100+ machines across global plants (12 sites rolled out within two years per the project), replaces paper scrap entry with MobileHMI on iPads, and—using the BAC tool—enables up to seven machines to be configured per hour, dramatically cutting development time and improving real‑time, proactive quality and performance visibility.


Open case study document...

ScholleIPN

Martin Molloy

Global Continuous Improvement Manager


Mitsubishi Electric Iconics Digital Solutions

128 Case Studies