Case Study: Mosenergo Heating and Pipeline achieves centralized real-time control of Moscow's heating network with Mitsubishi Electric Iconics Digital Solutions

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the Mosenergo Heating and Pipeline Case Study

Mosenergo Heating and Pipeline - Customer Case Study

Mosenergo Heating and Pipeline, which supplies hot water to 99% of Moscow’s buildings, faced the challenge of reliably delivering thousands of real-time parameters to operators and sending commands back to PLCs across 12 regional dispatch centers and multiple plants on a 24/7/365 basis. Mitsubishi Electric Iconics Digital Solutions was engaged, deploying ICONICS GENESIS32 along with ICONICS OPC servers (including a Modbus Ethernet OPC Server and a custom OPC Server built with OPC ToolWorX) and WebHMI to meet these performance and integration requirements.

Mitsubishi Electric Iconics Digital Solutions implemented a 5,000‑tag, distributed SCADA solution that consolidates monitoring and control of over ten heating plants and pump stations into one central command center. The GENESIS32/OPC deployment enabled full supervisory control in just a few months, let operators react to issues in real time, and delivered measurable engineering efficiencies—using GENESIS32’s Alias, Global Search & Replace and VBA scripting to speed screen updates and development—while keeping Moscow’s heating network operating reliably and delivering rapid savings.


Open case study document...