Case Study: Merrill Lynch achieves significant energy cost savings and centralized building control with Mitsubishi Electric Iconics Digital Solutions

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the Merrill Lynch Case Study

Merrill Lynch - Customer Case Study

Merrill Lynch needed a modern monitor-and-control solution for its Hopewell, NJ campus to manage HVAC, lighting, energy, security and fire systems across a large multi-building complex. Merrill Lynch engaged Mitsubishi Electric Iconics Digital Solutions, deploying ICONICS’ GENESIS32 HMI/SCADA suite with GraphWorX32, AlarmWorX32 and TrendWorX32 to provide an integrated, web-enabled building management system.

Mitsubishi Electric Iconics Digital Solutions delivered an OEM GENESIS32 Energy Smart Buildings system across 12 buildings (including 8 office buildings totaling 1,598,400 sq ft, 4 assembly buildings totaling 246,000 sq ft, and four parking garages with 2,594 spaces), with 1,000+ graphical screens, 3D visuals and animated device indicators. The solution uses ice plants for off-peak freezing and daytime cooling to time-shift energy use and trim the energy bill, and users reported highly positive feedback for realistic graphics and ease of operation—resulting in improved comfort, safety and streamlined facility control.


Open case study document...

Mitsubishi Electric Iconics Digital Solutions

128 Case Studies