Case Study: Hemi Controls achieves centralized, modern control of a 240MW hydroelectric generating station with Mitsubishi Electric Iconics Digital Solutions

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the Hemi Controls Case Study

Hemi Controls - Customer Case Study

Hemi Controls, a Montreal-based systems integrator working with Alstom Canada and Ontario Power, was tasked with modernizing a 240 MW hydroelectric generating station that includes 8 generators and 10 local control stations. To manage thousands of I/O points and integrate 12 Modicon PLCs while providing robust HMI/SCADA, alarm, trend and database access, Hemi Controls selected Mitsubishi Electric Iconics Digital Solutions’ GENESIS32 suite — including GraphWorX32, AlarmWorX32, TrendWorX32 MSDE, ScriptWorX32, OPC DataMining and Modbus OPC.

Mitsubishi Electric Iconics Digital Solutions deployed a centralized GENESIS32 supervision system with local GENESIS32 stations, two large flat panels for operations, and the Unified Tag Browser using the OPC DataMining driver to enable database read/write and remote access. The solution simplified supervision of thousands of points, delivered robust alarming and trending, and improved information access station-wide and remotely; GENESIS32 is also being rolled out to an additional 13 hydroelectric stations (1,266 MW total), demonstrating clear scalability and operational impact.


Open case study document...

Mitsubishi Electric Iconics Digital Solutions

128 Case Studies