Global Energy Generation Firm, a network of power plants in Central Russia anchored by a 2,500 MW site with four thermal power plants, faced the challenge of modernizing legacy DDC systems, integrating data from four production branches (each with ~5,000 I/O points) and executive systems, and delivering uniform, role-based dashboards and advanced reporting. To meet these needs they engaged Mitsubishi Electric Iconics Digital Solutions, deploying ICONICS GENESIS64 HMI/SCADA, Hyper Historian, BizViz (PortalWorX and ReportWorX) to replace limited legacy visualization and historian capabilities.
Mitsubishi Electric Iconics Digital Solutions implemented real-time and historical data integration (including MathWorks MatLab forecasts), SharePoint‑integrated dashboards, and advanced reporting, enabling optimal generator sequencing, fuel-consumption optimization, predictive maintenance scheduling, and continuous transparency of planned vs. actual production. The solution increased operational visibility and efficiency, enabled real‑time economic performance calculations and incentive-driven operations, and delivered actionable forecasts of next-day/week/month revenue and profit—while also enabling short‑ and long‑term optimization and reduced environmental costs through optimized condenser flow.