Case Study: Berge & Meer Touristik GmbH achieves centralized HVAC control with Mitsubishi Electric Iconics Digital Solutions GENESIS

A Mitsubishi Electric Iconics Digital Solutions Case Study

Preview of the Berge & Meer Touristik GmbH Case Study

Berge & Meer Touristik GmbH cuts HVAC development time and costs with Mitsubishi Electric Iconics Digital Solutions

Berge & Meer Touristik GmbH, a leading German tour operator, required a centralized automation platform to visualize, monitor, and operate a complex new HVAC system in its renovated office building. The challenges included gaining precise room- and zone-level control and finding a solution that could be deployed quickly and cost-efficiently by their system integrator, SysCom Automationstechnik GmbH. Mitsubishi Electric Iconics Digital Solutions provided the GENESIS64 software suite to meet these needs.

The solution implemented by Mitsubishi Electric Iconics Digital Solutions used BACnet controllers for granular, room-level data collection and the no/low-code GENESIS platform for rapid, flexible configuration. This resulted in a unified system for centralized HVAC monitoring and control, providing operators with clear visualization and the ability to adjust parameters for individual rooms. The project was delivered faster and with reduced development costs, achieving significant savings for the customer while meeting all requirements for building automation.


View this case study…

Mitsubishi Electric Iconics Digital Solutions

167 Case Studies