A Mitsubishi Electric Iconics Digital Solutions Case Study
The Beijing Traffic Control Center (BTCC) faced the challenge of unifying multiple systems, including SCADA, CCTV, and passenger information, under a single interface for 50 operator stations. This high-profile integration needed to be completed under significant time pressure before the 2008 Summer Olympics and required cross-platform compatibility with non-Microsoft systems. To meet this challenge, they partnered with vendor Mitsubishi Electric Iconics Digital Solutions and utilized their GENESIS HMI/SCADA suite.
Mitsubishi Electric Iconics Digital Solutions implemented their GENESIS software, specifically GraphWorX™, to create a unified monitoring and control interface. This solution seamlessly integrated the various platforms and automated incident response. The results included a 30% savings on engineering-related costs and the successful, timely deployment of a system that provided real-time unified monitoring across all rail lines, enabling the BTCC to meet its critical Olympic deadline.