Case Study: JL Schwieters reduces framing cycle time with MiTek

A MiTek Case Study

Preview of the JL Schwieters Case Study

JL Schwieters cuts floor installation time by 3 days with MiTek

The customer JL Schwieters, a residential construction company, sought to reduce framing cycle times and improve job site safety and efficiency. They partnered with vendor MiTek to implement a solution utilizing MiTek's software, automated machinery, and prefabricated floor cassettes.

The solution from MiTek involved engineering and producing floor truss cassettes off-site. These cassettes allowed JL Schwieters to install entire floor systems rapidly, with one home's floor set in one hour by a three-man crew. The results included a reduction in the framing cycle time by three days, improved crew safety by minimizing work at heights, and optimized crane time, allowing the company to exceed customer expectations.