MiTek
28 Case Studies
A MiTek Case Study
Encanto at Dos Lagos faced the challenge of building a cost-effective, code-compliant luxury multifamily development. MiTek provided its Lateral Systems and Structural Connectors to help the complex project trim costs while still meeting strict requirements.
The solution involved installing 465 MiTek Shear Walls and utilizing $250,000 worth of MiTek structural connectors. This collaboration added $30,000 back to the project's bottom line and ensured the successful completion of the 1,200-apartment development after eight months.