Case Study: ChargePoint achieves gigabit campus connectivity with Mimosa Networks

A Mimosa Networks Case Study

Preview of the ChargePoint Case Study

elping the world’s largest EV charging network company keep its employees connected

ChargePoint, the world’s largest and most open EV charging network, needed more bandwidth as its campus expanded to two office buildings about 600 yards apart. Before working with Mimosa Networks, the company was getting only about 100 Mbps from its local carrier and wanted a single network so employees could share the company LAN without using a VPN.

Mimosa Networks provided a wireless link between the buildings, enabling Gigabit speeds across ChargePoint’s offices. The solution required little additional equipment or configuration, supported the company’s VoIP phones, and reduced costs; ChargePoint also reported easier troubleshooting and no issues since deployment, with Mimosa Networks delivering a system that “just works.”


Open case study document...

ChargePoint

John

ChargePoint


Mimosa Networks

46 Case Studies