Inspection cycle times improved by 300% on Fully automated 3D Inspection CMM station powered by & Software

A Metrologic Group Case Study

Preview of the Sonaca Group Case Study

Case study about Sonaca Group working with Metrologic Group.

Open case study document...

Sonaca Group

Amaury Dupont

3D Inspection Programmer


Metrologic Group

3 Case Studies