Case Study: NRW Civil & Mining boosts haul efficiency and cuts emissions with MaxMine

A MaxMine Case Study

Preview of the NRW Civil & Mining Case Study

NRW Civil & Mining boosts haulage by 612,000 tons a year with MaxMine

NRW Civil & Mining sought an intelligent, technology-driven approach to reduce greenhouse gases at the Karara Iron Ore project. The company partnered with MaxMine to harness data-driven insights for its operations.

MaxMine enabled NRW to optimize payloads, haul speeds, and minimize idling. This resulted in an extra 612,000 tons of material moved annually without extra costs, alongside substantial fuel savings and CO2 emission reductions. The vendor's solution also helped improve operational scores from 79% to 96%.