A Materialise Case Study
Volvo Car Gent, the high‑volume assembly plant in Ghent, faced inefficiencies from heavy, welded gluing jigs used to apply logos and model marks — fixtures that were hard to calibrate, fragile, and had tolerances up to ±2 mm and long lead times. Working with Materialise, the plant sought a faster, lighter, and more accurate production‑fixture solution using additive‑manufacturing design expertise.
Materialise delivered a modular gluing jig that combines a lightweight carbon‑tube frame with 3D‑printed connection points, TPU buffers and PA 12 components, plus a dedicated calibration fixture. The new design achieves tolerances under 0.2 mm, costs 48% less, is 64% lighter, can be delivered in about two weeks, and has improved durability, ergonomics and expected reductions in scrap and rework — demonstrating Materialise’s impact on production efficiency.
Hannes Wauters
Equipment Engineer