Mango
54 Case Studies
A Mango Case Study
Skellerup, a global manufacturer of technical polymer products and vacuum pumps, faced a fragmented QHSE compliance landscape that had evolved into five separate systems, poor document control, missed reviews and difficult audits. To address this, Skellerup evaluated solutions against defined requirements and selected Mango—scoring Mango 92%—to provide an integrated compliance management solution delivered as a hosted SaaS.
Mango was implemented rapidly (adding value within a week) to deliver a single integrated management system covering Quality (ISO 9001), Health & Safety (NZS 4801) and Environment (ISO 14001). The Mango deployment produced measurable benefits: instant up-to-date reporting, better document control, faster handling of non-conformances and improvements, significant time and cost savings, and audit recognition of “excellent improvement” with no non-conformances.
Nick Steel
Project & ISO Business Systems Manager