Acorn Assembly boosts on-time deliveries from below 20% to 95% with LYNQ MES

Acorn Assembly, a manufacturer specializing in printed circuit board assembly, faced a critical challenge with on-time deliveries, which had fallen to below 20%. To address this, they turned to the LYNQ MES (Manufacturing Execution System) from the vendor LYNQ.

The implementation of LYNQ MES digitalized Acorn Assembly's paper-based processes, providing vital visibility into shop floor operations and capacity. This solution enabled the company to dramatically improve its on-time delivery rate to 95% within just one month. The results from LYNQ also included lower material waste, reduced labor costs, and a significant boost in workforce morale.