Case Study: Assembly HVAC Systems Plant achieves 10% TAKT gain with LSI DALS control board testing

A LSI - Logical Systems Inc Case Study

Preview of the Assembly HVAC Systems Plant Case Study

Assembly HVAC Systems Plant - Customer Case Study

The customer, Assembly HVAC Systems Plant, was facing significant productivity losses due to faulty control circuit boards from a partner facility failing during final unit testing. The vendor, LSI (Logical Systems Inc.), used its DALS reporting program to identify the trend and was engaged to address the challenge.

LSI designed and implemented a stand-alone DALS test station at the circuit board manufacturer's facility to test every board before shipment. This solution virtually eliminated faulty boards from reaching the final assembly line, saving 30-45 minutes per replacement and resulting in a 10% gain in daily unit production for the customer.