Case Study: Aquidneck Landworks reduces morning waste and boosts productivity with LMN and Greenius

A LMN Case Study

Aquidneck Landworks Inc cuts morning waste by $350K with LMN

Aquidneck Landworks Inc., a high-end residential landscaping company, faced a significant operational challenge with its morning routine. Crews were losing valuable paid time each day as trucks sat loading and teams waited for materials, often pushing job-site clock-in times past 9 am. This daily waste across multiple crews represented a major financial drain. To address this, the company turned to its vendor, LMN, and utilized the training platform Greenius.

LMN's solution involved implementing a documented standard operating procedure called Morning Roll Out, which was deployed through Greenius. This new system spelled out exact pre-departure expectations for crew members, accessible via QR codes in every truck. The result was a dramatic improvement: average job-site clock-in moved from 8:06 a.m. to 7:32 a.m. This recovered time translated into over $350,000 in reduced waste annually. Furthermore, since first partnering with LMN, Aquidneck Landworks has grown from $1.6 million to an $8.9 million revenue goal, a 5.5x leap.


View this case study…

LMN

17 Case Studies