Case Study: Diageo saves $90K per employee annually with Liquid UI for SAP PM

A Liquid UI Case Study

Preview of the Diageo Case Study

Diageo cuts work order creation time from 8 to 4 minutes with Liquid UI

Diageo, a global food and beverage manufacturer, faced significant challenges with its SAP PM system. Manual navigation through complex SAP screens slowed maintenance tasks, paper-based inspections led to data errors, and technicians lacked mobile access to equipment information on the plant floor. To address these issues, they partnered with vendor Liquid UI to implement its mobile and offline solution for handheld scanguns.

Liquid UI simplified the SAP PM screens by removing unnecessary fields and auto-populating data, enabling mobile and offline access for technicians. The solution digitized inspections with barcode scanning. As a result, Diageo achieved $90k in annual savings per employee, a 50% improvement in data integrity, and cut work order creation time in half from 8 to 4 minutes. Liquid UI also reduced SAP PM training time from 2 hours to just 30 minutes.


View this case study…

Liquid UI

70 Case Studies