Arch Chemicals, Inc., a manufacturing company, faced significant challenges with its SAP PM processes. Inefficient data entry required users to navigate multiple screens, taking up to 30 minutes for inexperienced staff to create a repair requisition. This led to incomplete processes and manual, paper-based time entry for contractors. To address this, they turned to the vendor Liquid UI and its Liquid UI for SAP GUI solution.
Liquid UI implemented a solution that consolidated all necessary data onto a single screen with pushbutton-driven actions, removing the need for paper and duplicate entries. The results were dramatic: work order completion time was reduced from 30 minutes to just 3 minutes on average. This eliminated hand-offs, improved data accuracy, and allowed all users to complete processes efficiently. The solution from Liquid UI achieved this without requiring any backend changes to their existing SAP system.