Case Study: Sulzer achieves 92% on-time work orders and paperless maintenance with Limble CMMS

A Limble CMMS Case Study

Preview of the Sulzer Case Study

Sulzer teams up with Limble CMMS to completely transform their maintenance processes and response times

Sulzer, a global industrial pumps company, was tracking all maintenance on paper, operating reactively with no failure logs or actionable reporting and only 49% of work orders completed on time. To modernize their processes and improve response times they partnered with Limble CMMS to move from paper-based workflows to a digital system.

Using Limble CMMS Sulzer uploaded assets and work orders in about two weeks, gained mobile access for technicians, and unlocked real-time reporting within four months; on-time work order completion rose from 49% to 76% within months and reached 92%, enabling a shift toward preventive maintenance. Limble CMMS also delivered measurable gains—productivity up 26%, downtime down 32%, and spare-part budget savings of 23%—while making all instructions, manuals, and reporting paperless and accessible.


Open case study document...

Sulzer

Jon Voeltner

Facilities & Testing Manager


Limble CMMS

30 Case Studies