Case Study: Aztec Construction Group reduces unplanned work with Limble CMMS

A Limble CMMS Case Study

Preview of the Aztec Construction Group Case Study

Aztec Construction Group - Customer Case Study

Aztec Construction Group, a family-owned civil contractor operating across several southeastern states, was struggling with highly reactive maintenance, disorganized work requests, weak preventive maintenance processes, and documentation challenges as it planned to expand into trucking. To solve this, the company evaluated CMMS options and chose Limble CMMS for its customizable, easy-to-use system, offline access, strong support, and flexible training in English and Spanish.

With Limble CMMS, Aztec Construction Group built preventive maintenance schedules, streamlined communication, added templates and QR codes for inspections, and improved visibility through custom dashboards. The results were significant: unplanned work dropped by more than 40%, reactive maintenance fell from 88% to under 50% in six months, work was completed on time 90% of the time, and better spare parts management saved the company $20,000.


View this case study…

Aztec Construction Group

Samantha Murphy-Handy

Business Process Consultant


Limble CMMS

30 Case Studies