LightYX supported Turner, a major construction contractor, on a complex curved layout scope for a high-end leisure space at LaGuardia Airport. The challenge was to accurately transfer intricate curved design elements from digital drawings to the jobsite, a task that traditionally required slow, labor-intensive manual methods like string lines and templates, which are prone to error.
Using its BeamerOne projection system, LightYX projected the layout directly onto the work surface. This solution allowed Turner's team to mark curved framing and slab-cut conditions quickly and accurately. As a result, LightYX completed 7,370 linear feet of layout in just 6 days, saving an estimated 14 days and 224 man-hours for a 330% productivity boost.