LightYX
6 Case Studies
A LightYX Case Study
LightYX supported DPR Construction on a complex curved framing layout for a 34,000 sq. ft. elderly healthcare facility in Orlando, FL. The project's main challenge was the highly complex layout, which was estimated to take three weeks using traditional methods and was further complicated by a lack of clear control lines on-site.
Using the LightYX BeamerOne system, the layout was projected directly onto the floor, simplifying the complex curved geometry. This solution allowed the work to be completed in just three days with a two-person crew, achieving a 4–6 times speed improvement compared to manual layout and resulting in zero rework. LightYX helped DPR Construction move faster while maintaining a high level of accuracy and quality.