Case Study: SNCF cuts on-site inspection admin burden from 20% to 1.5% with LetsBuild

A LetsBuild Case Study

Preview of the SNCF Case Study

SNCF cuts down on-site inspection admin burden from 20% to 1.5% by digitising reports

SNCF, France’s national railway operator, faced a tight three‑month deadline to renovate a 60 km stretch of track and relied on fast, accurate on‑site inspections to plan works. The customer’s inspection process was burdened by admin and inconsistent tracking—about 20% of on‑site time was spent on paperwork and communicating remarks—so SNCF turned to LETSBUILD’s digital on‑site inspection/reporting solution to standardise workflows and speed up coordination with the planning office.

LETSBUILD implemented a common digital platform for creating and sharing inspection reports in real time, replacing paper‑to‑Excel/Word workflows and reducing admin during inspections. As a result LETSBUILD helped SNCF cut admin time from roughly 20% to 1.5%, save an estimated 18 hours of follow‑up work per month, improve collaboration with the planning office, and complete detailed planning before the project deadline.


Open case study document...

LetsBuild

41 Case Studies