Case Study: Worldwide Pharmaceutical Company achieves 1.25M construction man-hours saved and zero lost-time accidents with LetsBuild

A LetsBuild Case Study

Preview of the Worldwide Pharmaceutical Company Case Study

How this Worldwide Pharmaceutical Company saved more than 1.25 million construction man hours without lost time accident (LTA)

One of the largest pharmaceutical companies headquartered a major vaccine unit in Wavre, Belgium and needed to design and build a GMP-compliant vaccine formulation facility under strict FDA/WHO requirements. The project involved many contractors, tight deadlines and manual, paper-based punch lists and documentation that threatened coordination, compliance and timely project reception — so the company implemented LetsBuild’s mobile punch-list and construction document-management solutions.

LetsBuild delivered a mobile punch-list system and construction-specific document workflows used by about 200 site employees, enabling on-site defect capture, instant punch-list distribution and always-current drawings. The collaborative “one team” approach helped complete the facility in 22 months, cut administrative paperwork by 50%, halved the reception workload, and contributed to saving more than 1.25 million construction man hours with no lost time accidents, while supporting pharmaceutical compliance and rapid refurbishment needs.


Open case study document...

LetsBuild

41 Case Studies