Case Study: Luthmore achieves a faster launch for its zero-emission tankless water heater with Lemberg Solutions’ BMS development

A Lemberg Solutions Case Study

Preview of the Luthmore Case Study

Luthmore launches BMS 4 months early with Lemberg Solutions

Luthmore, a UK-based company in the energy and consumer electronics sector, was looking to ensure a steady instant hot water supply for its tankless water heaters and needed to integrate a high-capacity battery. To ensure optimal performance and safety, they required expert assistance to develop a battery management system (BMS) and engaged Lemberg Solutions for firmware development and tech consulting.

Lemberg Solutions developed the BMS software ahead of schedule, delivering the project in just four months. The solution included features for voltage monitoring, temperature control, cell balancing, and fault detection, which ensured reliable battery performance and safety. This accelerated time-to-market allowed Luthmore to launch its product earlier than planned.


View this case study…

Lemberg Solutions

77 Case Studies