LeapThought
13 Case Studies
A LeapThought Case Study
Singapore Power Group (SP Group) faced the challenge of building Southeast Asia's largest underground substation beneath a 34-story skyscraper, a complex project spanning an area equivalent to four football fields. They appointed LeapThought to implement its FulcrumHQ platform as a common data environment and integrated digital delivery platform. This was necessary to manage the design and construction phases, ensuring secure collaboration between their numerous consultants and contractors, including Surbana Jurong and Hyundai Engineering.
LeapThought implemented its FulcrumHQ solution as a secure, Azure-powered SaaS platform with all data residing in Singapore. The system was operational within two weeks, providing comprehensive site management, mobile access for staff, and interactive dashboards. The results included a standardized, repeatable process for future projects, zero downtime or escalations over three years of operation, and a seamless transition from design to construction, ensuring the project remained on track for its 2024 completion.