Case Study: Complete Contracting Solutions boosts capacity and performance with KT Connections server upgrade

A KT Connections Case Study

Preview of the Complete Concrete Solutions Case Study

Complete Concrete Solutions - Customer Case Study

The customer, Complete Concrete Solutions (also operating as Complete Contracting Solutions, Inc.), a construction industry leader, faced a challenge with their IT infrastructure as their existing server was near capacity and could not support their growing operational needs. They partnered with their previous vendor, KT Connections, to implement a new server solution to handle their storage and performance requirements.

KT Connections responded by providing a new Scale HPE HE 150 server with 4TB of raw storage and 32GB of RAM. The implementation process took 45 days and included comprehensive data backup and a seamless transition from the old system. As a result, Complete Concrete Solutions now operates on a server that meets all current and future needs, eliminating worries about running out of space or capabilities and significantly benefiting all employees. The customer praised KT Connections for being service-driven and knowledgeable.


Open case study document...

Complete Concrete Solutions

Misty Fuller

Complete Concrete Solutions


KT Connections

10 Case Studies