Case Study: an organisation running Informatica PowerCenter and PowerExchange achieves zero-data-loss platform migration with Ksolves India Limited

A Ksolves India Limited Case Study

Preview of the Organisation running its integration workloads on Informatica PowerCenter and PowerExchange Case Study

Informatica Platform Upgrade Delivered with Zero Data Loss and Minimal Downtime

The customer, an organisation running its integration workloads on Informatica PowerCenter and PowerExchange, faced the challenge of upgrading its platform with a large portfolio of mappings and workflows. They required a migration with zero data loss, no extended downtime, and no fallback in production, all while navigating compatibility risks and deprecated features across their cluster nodes.

Ksolves implemented a structured, five-phase migration program covering assessment, infrastructure preparation, flow migration, testing, and production cutover. This phased approach ensured every compatibility risk was validated and resolved before progressing, transforming a high-risk migration into a predictable process. Ksolves delivered the upgrade with zero data loss, minimal downtime, and improved platform performance and stability for the client.


View this case study…

Ksolves India Limited

458 Case Studies