Case Study: Protech Integration achieves reliable outdoor DVI signal distribution for Tower of David Museum with Kramer

A Kramer Case Study

Preview of the Protech Integration Case Study

An AV Production Fit for a King

Protech Integration faced the significant challenge of installing a high-resolution DVI signal distribution system for a large outdoor night show at Jerusalem’s historic Tower of David Museum. With a demanding three-month deadline, they needed to deploy sensitive electronic equipment across an archeological site with complex routing, severe weather conditions, and strict aesthetic requirements.

Kramer provided the solution with their reliable 621T and 621R DVI over fiber optic transmitter/receiver pairs and LC-4 optical cables. This ensured the highest-quality signal transmission to twenty projectors regardless of distance or climate. The Kramer solution proved to be exceptionally dependable, enabling a successful and spectacular multi-sensory show that draws thousands of visitors annually.


View this case study…

Protech Integration

Asi Goren

System Integration Project Manager


Kramer

85 Case Studies