KONUX
10 Case Studies
A KONUX Case Study
Network Rail, responsible for maintaining the UK's vast rail infrastructure, faced a recurring issue with premature wear and degradation on a high-traffic crossing in its Wales Route. Routine inspections could not identify the root cause, forcing the organization into costly and disruptive reactive repairs. They suspected a loss of wheel-rail contact was to blame and turned to KONUX and its Switch solution to gain deeper visibility into the problem.
KONUX implemented its Wheel Trajectory Reconstruction (WTR) technology, which reconstructed wheel movements and measured impact forces under real operating conditions. The data confirmed wheels were lifting and striking the rail with 181% more force than expected, explaining the accelerated damage. This evidence allowed Network Rail to identify underlying track geometry issues as the root cause. With insights from KONUX, they shifted from reactive repair to proactive, data-driven maintenance, preventing recurring defects and improving reliability.