Case Study: Shoreline Manufacturing cuts manual workarounds and speeds material ordering with Katana

A Katana Case Study

Preview of the Shoreline Manufacturing Case Study

How Shoreline Manufacturing replaced $80,000 a year in workarounds with Katana

Shoreline Manufacturing, a contract metal fabricator, was held back by a disconnected and non-intuitive ERP system. This forced their team to rely on $80,000 a year in manual workarounds, tracking jobs on paper and in Excel, which caused major delays and a lack of visibility. They turned to Katana for a customized cloud-based inventory and manufacturing solution to address these core operational challenges.

Katana implemented a personalized system built around Shoreline's specific workflows in under two months. The solution provided connected data from quote to purchase, a scheduling calendar, and buy-to-order functionality. This resulted in material ordering that is over 99% faster, with the team processing more than 120 manufacturing orders in the first three weeks. The new system eliminated the costly manual workarounds and provided the data-driven visibility the business needed to grow.


View this case study…

Katana

42 Case Studies