Case Study: PK-30 System achieves faster, more accurate production scheduling with just plan it

A just plan it Case Study

Preview of the PK-30 System® Case Study

PK-30 System® cuts schedule changes from a day to 45 minutes with just plan it

PK-30 System®, a manufacturer of a meticulously designed aluminum demountable wall system, faced challenges with its time-consuming and inaccurate manual production scheduling process using in-house Excel spreadsheets. The company needed a solution to better coordinate production time frames and support effective decision-making. They selected the production scheduling software from the vendor just plan it to address these issues.

just plan it implemented its Gantt chart-based software, which provided strong visualization of project steps and the impact of changes. The onboarding process was fast, with the vendor's team taking time to understand PK-30's specific operations, allowing for customization and getting the system operational within two weeks. The results were significant: scheduling changes that once took a day now take less than 45 minutes, and the ability to provide accurate delivery dates led to a significantly higher quotation closing rate. just plan it also enabled production efficiency improvements and increased capacity.


View this case study…

just plan it

11 Case Studies