McCarthy Building Companies, a major construction firm, was hired by the City of Sioux Falls as a Construction Manager at Risk for a critical water reclamation plant expansion. The challenge was achieving cost certainty on the technically complex project, as initial estimates came in $50 million over the owner's original budget. This required intense collaboration with the design team and the city to align on scope and value-engineer the project, a process made more difficult by pandemic-induced inflation and relying on traditional spreadsheet tools.
They implemented the Join decision-making platform to foster transparency and real-time collaboration between the owner, engineer, and contractor. Join provided a centralized hub for tracking costs, exploring budget reduction scenarios, and facilitating informed decision-making, which was crucial for the open-book CMAR delivery method. Using Join, McCarthy successfully guided the team to a Guaranteed Maximum Price, building trust through visibility into cost build-ups and saving significant time in meetings that were now focused on decisions instead of reconciling data.
Steven Jarvis
Preconstruction Director