Case Study: Torre Mayor achieves 10% energy cost savings with Johnson Controls HVAC and Metasys upgrades

A Johnson Controls Case Study

Preview of the Torre Mayor Case Study

Torre Mayor cuts energy costs by 10% with Johnson Controls

Torre Mayor, a prominent office tower in Mexico City, faced the challenge of modernizing its aging HVAC and building automation systems to improve energy efficiency and support LEED Platinum certification, all while the building remained fully operational. To achieve this without disrupting daily business activities, they partnered with Johnson Controls for an integrated upgrade of their critical systems.

Johnson Controls implemented a solution featuring a new energy-efficient YORK centrifugal chiller and an upgrade to the Metasys Building Automation System. This integrated approach resulted in a 10% reduction in energy costs and achieved 40-45% energy savings during partial load conditions, while also improving occupant comfort and optimizing building operations.


View this case study…