Case Study: ANR Door Systems installs a 58-foot airport service door with Janus International

A Janus International Case Study

Preview of the ANR Door Systems Case Study

ANR Door Systems - Customer Case Study

The customer, ANR Door Systems, faced the challenge of installing a large service door 58 feet above ground at the Sanford Airport, requiring a durable product that could withstand a corrosive environment and came with a strong warranty. To meet this need, ANR turned to their longtime vendor, Janus International, for its SD20 service door.

Janus International provided a high-quality, powder-coated door system built to resist corrosion. The solution was successfully implemented in a complex, high-elevation installation on an active runway. The result was a seamless installation that exceeded the client's expectations, leading to a highly satisfactory outcome for the general contractor and the airport authority and strengthening the relationship between ANR Door Systems and the contractor for future projects.


Open case study document...

ANR Door Systems

John Ault

President


Janus International

13 Case Studies