Case Study: Pedernales Electric Cooperative achieves fast, reliable big data migration with Itransition

A Itransition Case Study

Preview of the Pedernales Electric Cooperative Case Study

Pedernales Electric Cooperative - Customer Case Study

Pedernales Electric Cooperative, the largest distribution electric cooperative in the USA, needed to migrate a massive ECM repository on IBM FileNet P8 after it grew beyond 1 terabyte and began causing major performance issues and downtime. The company turned to Itransition to handle the legacy data export and conversion as part of its move to a more scalable ERP system.

Itransition built a custom ETL utility to automate extraction, transformation, indexing, and migration of more than 24 million files, including images, XML load files, and over 1,024 gigabytes of documentation. The solution processed data 10 times faster than expected, maintained accuracy and original structure, and enabled smooth migration without hurting system performance or interrupting daily work.


Open case study document...

Itransition

58 Case Studies