Case Study: a laboratory information system provider achieves a successful Oracle-to-PostgreSQL migration with Ispirer Systems

A Ispirer Systems Case Study

Preview of the Laboratory Information System Provider Case Study

Laboratory Information System Provider migrates 400,000 LOC to PostgreSQL in 11 months with Ispirer Systems

Ispirer Systems provided migration services for a laboratory information system provider based in the United States. The client needed to move their Oracle database to PostgreSQL to meet project requirements and utilize extended functionality. The migration scope was significant, consisting of over 400,000 lines of code, 1,400 tables, and 400 packages.

The solution was implemented in stages using Ispirer Toolkit, which was enhanced with new conversion rules to handle complex package data types and other specific challenges. After testing, the completed PostgreSQL database was delivered. As a result, Ispirer Systems enabled the client to lower the risks of using an outdated database system and facilitated their future work, while also improving their own toolkit for subsequent migration projects.


View this case study…

Ispirer Systems

67 Case Studies